EIE326 Enlisted Dormitory

Industrial

This project included complete demolition of two buildings to allow the construction of a new 168-person dormitory. Activities included site characterization; sampling and analysis; asbestos abatement; building and foundation demolition; hauling; and material disposal. The two buildings demolished were 4-level “Hammerhead” structures built on military installations.

Posted in

ColdFoot Environmental Services, Inc.