GENERAL INFORMATION
Location: Anchorage, Alaska
Type of Project: Residential; Asbestos Abatement & Renovation
Project Duration: September-December 2012
Contractor Type: Subcontractor
WORK DETAILS
Hazardous Materials Removed: Asbestos, Sheet Vinyl, Batt Insulation
Quantity Removed: 214 CY
Scope of Work: Reviewed hazardous material building survey with general contractor. Suggested additional sampling and analysis to assist with development of scope of work. Prepared work plan and submitted all local, state, and federal notifications. Prepared exemption documentation for fire damaged buildings and submitted to the EPA. Set up negative pressure containments in each unit. Decontaminated personal belongings for building occupants. Removed all gypsum wallboard on the ceilings and interior walls, fiberglass batt insulation in ceilings and walls, and sheet vinyl flooring in kitchens and bathrooms. All work had to be coordinated and phased to continue renovation activities for each unit. Temporary electrical, heating, and water were maintained and conserved during the winter project duration. Despite the freezing temperatures, the project was a success with no accidents.
Work Subcontracted: Air Monitoring
Overall Evaluation: Excellent