Anchorage

Tudor Road Demo

By ColdFoot Environmental Services, Inc. / December 24, 2020 /

LocationTudor Road, Anchorage, Alaska CommercialThis project included complete demolition of the Parks Highway in Wasilla Alaska. Activities included asbestos removal on cement board, exterior walls, sidewalks, curbs, and sign posts; sampling, analysis, and air monitoring; complete demolition; waste hauling; and material disposal.

Read More

Reka Drive

By ColdFoot Environmental Services, Inc. / December 24, 2020 /

Residential This project included complete removal of vermiculite ceiling insulation to allow for thermal upgrades of the building envelope. Activities included sampling and analysis; asbestos abatement; hauling; and material disposal.

Read More

East 24th Avenue Renovation

By ColdFoot Environmental Services, Inc. / December 24, 2020 /

LocationEast 24th Avenue, Anchorage, Alaska ResidentialThis project consisted of asbestos abatement removal services of a residential home in Anchorage Alaska. Activities included asbestos removal of gypsum wallboard with ceiling texture; sampling, analysis, and air monitoring; waste hauling; and material disposal.

Read More

H Street

By ColdFoot Environmental Services, Inc. / December 24, 2020 /

Residential This project included complete removal of ceiling, wall, and floor surfaces to allow for a full renovation. Activities included sampling and analysis; asbestos abatement; hauling; and material disposal.

Read More

CITC Building

By ColdFoot Environmental Services, Inc. / December 24, 2020 /

Commercial This project included selective demolition and mold remediation due to damage caused by an earthquake. Activities included sampling and analysis; selective ceiling, wall, and floor demolition; hauling; and material disposal.

Read More

WWTF Incinerator Removal

By ColdFoot Environmental Services, Inc. / December 24, 2020 /

LocationHutson Drive, Anchorage, Alaska IndustrialThis project consisted of hazardous materials removal, asbestos abatement, lead abatement, and selective demolition including abatement of an incinerator. Activities included asbestos removal of ACM containing exhaust ducts insulation, bricks, rope gaskets, flange gaskets, and valve packing; removal of hazardous materials including mercury switches and fluorescent light fixtures; sampling, analysis, and…

Read More

Turnagin Elementary School Renovation

By ColdFoot Environmental Services, Inc. / December 24, 2020 /

LocationWest Northern Lights Boulevard, Anchorage, Alaska IndustrialThis project consisted of asbestos abatement, hazardous materials abatement, and selective demolition services for the Anchorage School District. Activities included asbestos abatement of flooring, mastic, gypsum wallboard, ceiling tiles; selective demolition including plumbing, mechanical, and electrical items; removal of materials; transportation and disposal of hazardous waste and general demolition…

Read More

West High School/Roming Middle School and Renovation

By ColdFoot Environmental Services, Inc. / December 24, 2020 /

LocationAnchorage, Alaska Type of Project: Industrial; Asbestos AbatementProject Duration: March – June 2015Contractor Type: Subcontractor WORK DETAILSHazardous Materials Removed: AsbestosQuantity Removed: 3,450 SFScope of Work: This project included hazmat removal services and selective demolition of both West High School and Roming Middle School in Anchorage Alaska. Activities included asbestos abatement; chemical hazard removal; sampling and…

Read More

Demo Building 736

By ColdFoot Environmental Services, Inc. / December 24, 2020 /

LocationJBER, Alaska IndustrialThis project consisted of complete demolition of building 736 on JBER. Activities included complete building demolition including all walkways, steps, stoops, lift poles, and foundation; utilities disconnect; sampling, analysis, and air monitoring; backfill and excavation; waste hauling; and material disposal.

Read More