Fatal Falls Highest In Construction
Did you know that construction has the most fatal falls of all industries? In 2017, fatal falls accounted for 366 of 971 total construction fatalities and represented more than 1/2 (51%) of ALL work-related falls nation-wide! Small construction companies, those with 10 of fewer employees, account for 61% of the 51% nation-wide fatal falls; that’s…
Read MoreTudor Road Demolition
GENERAL INFORMATION Location: Anchorage, AlaskaType of Project: Commercial; Asbestos AbatementProject Duration: October 2015Contractor Type: Subcontractor WORK DETAILSHazardous Materials Removed: AsbestosQuantity Removed: UnknownScope of Work: This project included complete demolition of the Tudor Rd. Wendy’s in Anchorage, Alaska. Activities included asbestos removal on most of the building. Along with sampling and analysis; air monitoring; complete demolition;…
Read MoreReka Drive
Residential This project included complete removal of vermiculite ceiling insulation to allow for thermal upgrades of the building envelope. Activities included sampling and analysis; asbestos abatement; hauling; and material disposal.
Read MoreEast 24th Avenue Renovation
LocationEast 24th Avenue, Anchorage, Alaska ResidentialThis project consisted of asbestos abatement removal services of a residential home in Anchorage Alaska. Activities included asbestos removal of gypsum wallboard with ceiling texture; sampling, analysis, and air monitoring; waste hauling; and material disposal.
Read MoreH Street
GENERAL INFORMATION Location: Anchorage, AlaskaType of Project: Commercial; Hazmat Removal Services and DemolitionProject Duration: February-March 2020Contractor Type: Subcontractor WORK DETAILSHazardous Materials Removed: AsbestosQuantity Removed: 4,692 SFWork Subcontracted: Air MonitoringOverall Evaluation: Excellent
Read MoreAsplund Waste Water Treatment Incinerator Removal
GENERAL INFORMATION Location: Anchorage, AlaskaType of Project: Industrial; Hazardous Materials Removal & Selective DemolitionProject Duration: January-June 2016Contractor Type: Prime Contractor WORK DETAILSHazardous Materials Removed: Asbestos, Lead, MercuryQuantity Removed: UnknownScope of Work: This project consisted of hazardous materials removal, such as asbestos, incinerator and lead abatement, along with selective demolition. Activities included asbestos removal of exhaust…
Read MoreTurnagain Elementary School Renovation
GENERAL INFORMATION Location: Anchorage, AlaskaType of Project: Commercial; Abatement & DemolitionProject Duration: April 2016-December 2017Contractor Type: Subcontractor WORK DETAILSHazardous Materials Removed: AsbestosQuantity Removed: 50,000 SFScope of Work: This project consisted of asbestos and other hazardous materials abatement, along with selective demolition services for the Anchorage School District. Activities included abatement of flooring, mastic, gypsum wallboard,…
Read MoreWest High School/Roming Middle School and Renovation
LocationAnchorage, Alaska Type of Project: Industrial; Asbestos AbatementProject Duration: March – June 2015Contractor Type: Subcontractor WORK DETAILSHazardous Materials Removed: AsbestosQuantity Removed: 3,450 SFScope of Work: This project included hazmat removal services and selective demolition of both West High School and Roming Middle School in Anchorage Alaska. Activities included asbestos abatement; chemical hazard removal; sampling and…
Read MoreDemo Building 736
LocationJBER, Alaska IndustrialThis project consisted of complete demolition of building 736 on JBER. Activities included complete building demolition including all walkways, steps, stoops, lift poles, and foundation; utilities disconnect; sampling, analysis, and air monitoring; backfill and excavation; waste hauling; and material disposal.
Read MoreBR 147.5 Replace Pony Truss
GENERAL INFORMATION Location: Anchorage, AlaskaType of Project: Industrial; DemolitionProject Duration: January 2019-December 2020Contractor Type: Subcontractor WORK DETAILSHazardous Materials Removed: LeadQuantity Removed: 50 CY Scope of Work: This project included the demolition and removal of the 147.5 Pony Truss Bridge with through plate girder. Activities included lead abatement; mobilization and demobilization of equipment; demolition; and material…